Kinnaird Opportunistic Sewer Separation

  • Duration: 2020-2022
  • Client: EPCOR
  • Project Type: Water/Wastewater

Project Overview

This project consisted of connecting an existing 1,200 mm storm sewer to an existing 1,800 mm storm sewer. To make this connection, a new storm sewer was constructed and consisted of approximately 469.7m of 1,350 mm diameter pipe and 6.1 m of 1,500 mm diameter pipe and were installed by trenchless methods. Along the new alignment, seven (7) new concrete manholes were installed.