Kinnaird Opportunistic Sewer Separation
- Duration: 2020-2022
- Client: EPCOR
- Project Type: Water/Wastewater
Project Overview
This project consisted of connecting an existing 1,200 mm storm sewer to an existing 1,800 mm storm sewer. To make this connection, a new storm sewer was constructed and consisted of approximately 469.7m of 1,350 mm diameter pipe and 6.1 m of 1,500 mm diameter pipe and were installed by trenchless methods. Along the new alignment, seven (7) new concrete manholes were installed.